1. At present, there is duplicacy of work being done in RO. Hence, there is no need of RO. There is only All India/ Circle/Divisional cadres in the Department. When there is no regional cadre, why Regions are required. There should be only Circles. All establishment working in ROs be shifted to Circles and utilised for implementation/monitoring of decisions of the Department.
2. All posts of APMGs/ADs/ASPs/IPs in the Circle be upgraded as JAGs/APMGs/ADs/ASPs respectively.
3. All single handed SOs may be considered for closure and existing manpower be utilised in other needy post offices.
4.Status of all triple handed SOs be upgraded as LSG/PM Grade-I.
5. Status of all LSG/PM Grade-I SOs be upgraded as HSG-II/PM Grade-II.
6. Status of all HSG-II/PM Grade-II HOs/SOs be upgraded as HSG-I/PM Grade-III.
7. Status of all Group "B" HOs be upgraded as Group "A" HOs.
8. All Group "A" Divisions/HOs be upgraded as JAG Divisions/HOs & all Group "B" Divisions be upgraded as Group "A" Divisions. There should be only JAG/Group "A" Divisions.
9. All existing Sub Divisions be provided office staff and post of Mail Overseer be converted in to Asstt. Inspector (PA cadre).
2. All posts of APMGs/ADs/ASPs/IPs in the Circle be upgraded as JAGs/APMGs/ADs/ASPs respectively.
3. All single handed SOs may be considered for closure and existing manpower be utilised in other needy post offices.
4.Status of all triple handed SOs be upgraded as LSG/PM Grade-I.
5. Status of all LSG/PM Grade-I SOs be upgraded as HSG-II/PM Grade-II.
6. Status of all HSG-II/PM Grade-II HOs/SOs be upgraded as HSG-I/PM Grade-III.
7. Status of all Group "B" HOs be upgraded as Group "A" HOs.
8. All Group "A" Divisions/HOs be upgraded as JAG Divisions/HOs & all Group "B" Divisions be upgraded as Group "A" Divisions. There should be only JAG/Group "A" Divisions.
9. All existing Sub Divisions be provided office staff and post of Mail Overseer be converted in to Asstt. Inspector (PA cadre).
No comments:
Post a Comment