D.G. Posts No. 5-1/07-WS-I Dated: 15.10.2012
Sub: Protection of TRCA of
GDS BPM
The matter regarding
protection of allowance of GDS BPM in the event of reduction of workload has
been engaging attention of the Directorate for some time past. It has now been
decided with immediate effect, that in the event of drop in the workload of the
BPM to that of the lower slab, protection of allowance (TRCA) at the excising
slab of TRCA of GDS BPM would be provided for an year, thereby giving an
opportunity to the GDS BPM to improve the workload to the original level or higher.
On completion of this one year, a special review will be conducted to assess
the workload of the Branch Postmaster and if the workload after review is found
to be at reduced level, the allowance will be reduced to corresponding TRCA
slab.
These issues with
the concurrence of Integrated Finance Wing vide their Diary No. 257/FA/12/CS
dated 15.10.2012.
Sd/-
(L.K. GANGADHARAN)
ADG (ESTT.)
No comments:
Post a Comment